Print Page
Image is for illustrative purposes only. Please refer to product description.

| Manufacturer | MARATHON SPECIAL PRODUCTS |
|---|---|
| Manufacturer Part No | 1413400Copy |
| Manufacturer Standard Lead Time | 6 weeks |
| Order Code | 2116698 |
| Your Part Number | |
| Technical Datasheet |
234 In Stock
Need more?
234 Delivery in 4-5 Business Days(US stock)
| Quantity | Price (inc GST) |
|---|---|
| 1+ | S$141.090 (S$153.7881) |
| 5+ | S$129.820 (S$141.5038) |
| 10+ | S$119.550 (S$130.3095) |
| 25+ | S$109.990 (S$119.8891) |
| 50+ | S$107.800 (S$117.502) |
| 100+ | S$105.600 (S$115.104) |
Price for:Each
Minimum: 1
Multiple: 1
S$141.09 (S$153.79 inc GST)
Line Note
Added to your Order Confirmation, Invoice, and Dispatch note for this order only.
Product Information
| Manufacturer | MARATHON SPECIAL PRODUCTS |
|---|---|
| Manufacturer Part No | 1413400Copy |
| Manufacturer Standard Lead Time | 6 weeks |
| Order Code | 2116698 |
| Technical Datasheet | |
| Rated Current | 115A |
| No. of Poles | 3 Pole |
| Line Side Connections Per Pole | 1 |
| Line Side Connection Method | Screw |
| Load Side Connections Per Pole | 4 |
| Load Side Connection Method | Screw |
| SVHC | Lead (17-Jan-2022) |
Technical Specifications
| Rated Current | 115A |
|---|---|
| Line Side Connections Per Pole | 1 |
| Load Side Connections Per Pole | 4 |
| SVHC | Lead (17-Jan-2022) |
| No. of Poles | 3 Pole |
|---|---|
| Line Side Connection Method | Screw |
| Load Side Connection Method | Screw |
Technical Docs (2)
Legislation and Environmental
| Country of Origin: Country in which last significant manufacturing process was carried outCountry of Origin: | United States Country in which last significant manufacturing process was carried out |
|---|---|
| Tariff No: | 85369010 |
| US ECCN: | EAR99 |
| EU ECCN: | NLR |
| RoHS Compliant: | Yes RoHS |
| RoHS Phthalates Compliant: | Yes RoHS |
| SVHC: | Lead (17-Jan-2022) |
| Download Product Compliance Certificate | Product Compliance Certificate |
| Weight (kg): | .098885 |
