Print Page
Image is for illustrative purposes only. Please refer to product description.

ManufacturerABB - THOMAS & BETTS
Manufacturer Part No5242Copy
Manufacturer Standard Lead Time4 weeks
Order Code1905502
Your Part Number
Available to Order
Manufacturer Standard Lead Time: 4 week(s)
Notify me when back in stock
| Quantity | Price (inc GST) |
|---|---|
| 1+ | S$20.940 (S$22.8246) |
| 10+ | S$20.190 (S$22.0071) |
| 25+ | S$16.850 (S$18.3665) |
| 100+ | S$15.560 (S$16.9604) |
| 250+ | S$14.240 (S$15.5216) |
| 500+ | S$13.960 (S$15.2164) |
Price for:Each
Minimum: 1
Multiple: 1
S$20.94 (S$22.82 inc GST)
Line Note
Added to your Order Confirmation, Invoice, and Dispatch note for this order only.
Product Information
ManufacturerABB - THOMAS & BETTS
Manufacturer Part No5242Copy
Manufacturer Standard Lead Time4 weeks
Order Code1905502
Technical Datasheet
Conduit Configuration45 Degree
Conduit MaterialIron
Conduit ColourMetallic - Zinc Finish
IP / NEMA Rating-
Technical Specifications
Conduit Configuration
45 Degree
Conduit Colour
Metallic - Zinc Finish
Conduit Material
Iron
IP / NEMA Rating
-
Technical Docs (2)
Legislation and Environmental
Country of Origin:
Country in which last significant manufacturing process was carried outCountry of Origin:Germany
Country in which last significant manufacturing process was carried out
Country in which last significant manufacturing process was carried outCountry of Origin:Germany
Country in which last significant manufacturing process was carried out
Tariff No:74122000
US ECCN:EAR99
EU ECCN:NLR
RoHS Compliant:Yes
RoHS
RoHS Phthalates Compliant:Yes
RoHS
Download Product Compliance Certificate
Product Compliance Certificate
Weight (kg):.13608
